I-70 Mountain Corridor Widening

Slope stability analysis and rockfall mitigation design for a 6-mile mountain corridor widening, keeping the project on its permitting timeline.

The challenge

Widening six miles of interstate through a mountain corridor meant cutting back steep slopes that had been shedding rock onto the roadway for decades. The permitting timeline was fixed before the geotechnical work began, so the slope and rockfall analysis had to be right the first time.

What we did

Stratum mapped the cut slopes, drilled and logged borings along the alignment, and ran slope stability analysis for the proposed cut geometries. We then designed rockfall mitigation — catchment and slope treatments matched to the failure modes we observed in the field — and delivered a PE-stamped report to the owner and the permitting agency.

Outcome

The report was accepted without a second round of investigation and the project stayed on its permitting timeline.

6 mi

Corridor widened

On time

Permitting milestone held

PE-stamped

Slope & rockfall report

Talk to a geologist before you talk to a permitting board.

Tell us about the site and the timeline. We'll scope the investigation and get a proposal back within a week.

Request a proposal

Offices

Denver, COHQ

Salt Lake City, UT

Reno, NV

Stratum Geoscience

Licensed PE/PG in Colorado, Utah, Nevada, Wyoming, Montana, and Idaho.

© Stratum Geoscience. All rights reserved.